Civil Solutions Group performed Storm Water Pollution Prevention Plan (SWPPP) inspections. The multi-family development was constructed in 2017 and 2018. Site inspections were conducted by a registered storm water inspection (RSI) every two weeks or after a significant storm to monitor erosion control systems installed on-site.